The relocation of the existing Stagecoach facilities to a new purpose-built depot in a vacant area of the depot in Cwmbran, comprising of office space, vehicle servicing bays with associated works including bus parking, staff parking, skip storage, fuel store and bus washing facilities.

The new Stagecoach depot is a 2-storey steel frame structure that included 9 service bays
with inspection pits designed to tie in with the ground floor concrete slab. On the roof of the main building a green roof was required as part of the SuDS design to improve water quality.

As part of the external works design, where we were required to facilitate the bus parking, as well as the fuel storage and bus washing facilities. The external drainage design had to be carefully co-ordinated to compliment the SAB approved drainage system, using the latest systems and products to manage surface water run-off in an industrial development.