Ysgol Pen Rhos

  20 February 2024    

The brief was for a new Primary school site on a contaminated brownfield site with numerous constraints. We were required to provide numerous coordinated detailed designs for the sub-structure, super structure and drainage which were significantly more detailed than would normally be required at planning stage whilst working within a very restricted design brief. We were able to provide very efficient and robust engineering solutions which was acceptable to all parties involved.